Temporary Trail Alert – Bedford Mills Bridge Construction and closure of parking lot at 06D

28 June/2026

The highway bridge on Perth Road at Bedford Mills will be under construction for all of summer 2026. The small parking lot at 06D is currently being used for heavy materials storage and construction crew parking. Alternate parking is available at the historic Anglican Church on Bedford Mills Rd, or at the larger lot at the boat launch about 200 m north of 06D.

The township post about the construction can be found at the following link: June 12, 2026 | Bedford Mills Bridge Rehabilitation (Perth Road # 10) | EngageFrontenac.ca